Overview
During this second semester of 2019, the government is aiming to organize a number tenders for waste-to-energy power plant (pembangkit listrik tenaga sampah – “PLTSa”) projects, specifically in Tangerang, Bandung and South Tangerang.[1] These cities comprise three of twelve areas which have been allocated for the implementation of the accelerated construction of PLTSa, as addressed under Regulation of the President No. 35 of 2018 on the Accelerated Construction of Waste-Processing Electrical-Energy Installations Based on Environmentally Friendly Technologies (“Regulation 35/2018”).[2]
......